Sunday, March 14, 2010

...and more...


_MG_9785, originally uploaded by k_pfeif.


...down the room....

Framing...after a weekend.


_MG_9781, originally uploaded by k_pfeif.


Lots of progress.

More to come.

Monday, March 01, 2010

Plumbing Planning


_MG_9775, originally uploaded by k_pfeif.


I have to bust out some concrete and put some new DWV stuff in here. Too bad I have no idea how to do this.



Ok, lumber is ordered, permits are coming, and I'm acquiring other materials and tools.

First step: insulation.

This isn't as easy as you'd think. The jury is still out as far as what the best approach to insulating a basement. Here's what I do know...

1. The house has 1" Owens-Corning Foamular 150 on the outside of the walls.

2. The rim joist area was insulated with fiberglass. When you pull these out, there's all kinds of moisture in there. Essentially air is moving through this area and condensing on the rim joist. The local building inspector said mold is a problem lately, so I want to avoid that. Solution: a DIY spray foam insulation kit by Tiger Foam. I considered doing it via rigid insulation, but cutting and trimming that would have taken months.

3. The top 4' of the wall is where most of the heat loss is, after the rim joist area. According to the Building Science Institute, you prevent only 10% heat loss insulating from 4' below grade on down. This means I'll only insulate the top 4'. Batt insulation won't be installed. The building inspector said this is a good approach.

Ok, more to follow.


Monday, December 07, 2009

Plan, etc.

Ok, the plans are just about ready for submission to the Village of Merton for permits. Yes, I'm doing it the right way.

What's a bit concerning is the incredibly bad reviews that the local building inspector and electrical inspector get from other homeowners. It seems that rules are applied inconsistently, and they tend to be unhelpful. So, to alleviate this, I'm going to be creating a "Finishing Your Basement in Merton" section. Others can contribute when they've had run-ins, so hopefully we'll have a pretty good list of "how-tos" when this is complete.

Tuesday, June 23, 2009

P.S.


_MG_7698, originally uploaded by k_pfeif.

The house turned out fine.

Saturday, June 20, 2009

Same design...different angle.


Second Try, originally uploaded by k_pfeif.

Proposed Design


Up, originally uploaded by k_pfeif.

Here it is so far. Note the hallway to the right.

Monday, June 15, 2009

Monday, April 16, 2007

Kitchen II.


_MG_2367, originally uploaded by k_pfeif.

Kitchen. Pam.


_MG_2373, originally uploaded by k_pfeif.

Stair millword


_MG_2383, originally uploaded by k_pfeif.

Hall bath


_MG_2376, originally uploaded by k_pfeif.

Lockers


_MG_2377, originally uploaded by k_pfeif.

Big.


_MG_2380, originally uploaded by k_pfeif.

Fireplace


_MG_2382, originally uploaded by k_pfeif.

Saturday, April 07, 2007

Jake demonstrates the shower.


IMG_0113.JPG, originally uploaded by k_pfeif.


No water.

Lockers.


IMG_0105.JPG, originally uploaded by k_pfeif.

Stained cabinets.


IMG_0099.JPG, originally uploaded by k_pfeif.

Nice.

Sara demonstrates a door.


IMG_0103.JPG, originally uploaded by k_pfeif.